Green Hydrogen

Legal support for green hydrogen projects

David Engel supports green hydrogen projects from project structure through RFNBO-compliant power sourcing, funding and permitting to the supply and offtake agreements and ongoing operation. For industrial companies, electrolyser operators and project developers.

Eight years of experience in energy law, in law firms and in the legal department of an industrial company. To the RFNBO check for power sourcing

Clients

Industrial companies as offtakers

Chemicals, refineries, steel, glass and ceramics that need to replace grey hydrogen or meet the RFNBO quota under Art. 22a RED III.

Electrolyser operators

Municipal utilities, project developers, industrial gas companies and renewable energy producers with electrolysers connected to the grid or behind the grid connection of a generation plant.

Sites with a plant network and core network connection

Sites with their own hydrogen pipelines, storage and trailer logistics, and connection to the hydrogen core network.

Project path

A sample electrolysis project

On the left are the typical milestones of the project, on the right the legal work in each phase. The legal obligations and deadlines schedule is drawn up at the start and updated with each phase.

As of 12 November 2026.

Project · Milestones
ENGEL | LEGALLegal support
01

Concept and site

  • Feasibility study and pre-FEED
  • Decision on electrolysis technology, capacity and site: grid connection, water, offtakers nearby
  • Letters of intent with offtakers and electricity suppliers
ENGEL | LEGAL
  • Contract structure of the projectAllocation of services, risks and remuneration between operator, electricity supplier, offtaker and plant supplier.: own operation, project company or operator model
  • Permitting strategy: choice of procedure for the electrolyser and hydrogen storage (BImSchG, Federal Immission Control Act)
  • RFNBO concept for power sourcingGreen hydrogen within the meaning of RED III requires that the electricity used counts as renewable: a direct line from a generation plant, or grid electricity with a PPA that meets additionality as well as temporal and geographical correlation (Delegated Regulation (EU) 2023/1184).: direct line, PPA or grid electricity
  • Energy infrastructure at the siteCustomer installation (Kundenanlage) and closed distribution system, direct line, grid connection and grid connection extension, metering concept for third-party installations on the site.
  • Term sheets and memoranda of understanding
  • Counting towards the offtakers' RFNBO quota (RED III), classification of the pipelines under hydrogen network regulation (EnWG, Energy Industry Act)

Obligations and deadlines schedule drawn up

02

Power sourcing and grid connection

  • Grid connection request for the electrolyser
  • Choice of power source: direct line, PPA or grid electricity
  • Term sheet with the electricity supplier
ENGEL | LEGAL
  • Connection concept and grid connection agreement, for a direct line also line rights and rights of way
  • Network charges and levies: exemption under Section 118(6) EnWG, special network charge for electrolysersUnder the Federal Network Agency's AgNes determination, electrolysers for green or low-carbon hydrogen pay a special network charge as a pure capacity charge. Without proof of certification, the general network charge for consumers applies., Section 25 EnFG
  • Electricity tax relief for electrolysis (Section 9a StromStG)
  • PPA: additionalityThe generation plant must have come into operation no more than 36 months before the electrolyser and must not have received operating or investment aid. For electrolysers that come into operation before 1 January 2028, the criterion applies only from 1 January 2038. In April 2026, the European Commission announced a targeted revision of the criteria for power sourcing., temporal correlationUntil 31 December 2029, electricity generation must fall within the same calendar month as hydrogen production, and from 1 January 2030 within the same hour. Member States may require hourly correlation from 1 July 2027. and geographical correlationThe generation plant and the electrolyser are located in the same bidding zone or in a neighbouring bidding zone with a higher electricity price.
  • Grid electricity without a PPA only in the exceptional cases of Art. 4 of Delegated Regulation (EU) 2023/1184

Obligations and deadlines schedule updated: deadlines arising from grid connection and power sourcing

03

Funding

  • Bid in the European Hydrogen Bank auction or funding application (IPCEI, Bundesförderung Industrie und Klimaschutz)
  • For offtakers: bid in the procedure for Carbon Contracts for Difference (climate protection contracts)
  • Award or funding decision
  • Conclusion of the funding agreement
ENGEL | LEGAL
  • Legal review of the application documents and the funding conditions
  • Alignment of the project contracts with the funding conditions
  • Cumulation with and offsetting of other funding

Obligations and deadlines schedule updated: deadlines and evidence requirements under the funding

04

Permitting

  • Agreeing the procedure with the authority
  • Submission of the application documents
  • BImSchG permit for the electrolyser and hydrogen storage, water-law permit
ENGEL | LEGAL
  • Legal support in dealings with the authority
  • Legal review of the application documents
  • Major-accident law for the storage of hydrogen (12th BImSchV)
  • In the formal procedure: support during public participation and the public hearing
  • Review of the permit and its ancillary provisions

Obligations and deadlines schedule updated: permit conditions and ancillary provisions

05

Project contracts and investment decision

  • Completion of FEED (Front-End Engineering and Design)
  • Award of the EPC contract and order for the electrolyser
  • Power supply secured
  • Hydrogen offtake secured
  • Final investment decision (FID)
ENGEL | LEGAL
  • Support with the EPC and supply contract for the electrolyser: performance guarantees, degradation, availability
  • Electricity supply agreement and PPA with RFNBO clausesSupplier warranties on the commissioning and funding of the generation plant, guarantees of origin, data delivery for temporal correlation, consequences of losing RFNBO status.
  • Hydrogen supply and offtake agreements: volumes, purity, pressure, take-or-pay, price formula, proof of RFNBO status
  • Agreements on transport and storage: trailer, pipeline, connection to a hydrogen network
  • Legal preparation of the investment decision: legal summary in the decision paper and, for debt financing, direct agreementsDirect agreements between the project company, its contract partners and the financing banks, for example with step-in rights for the bank in EPC and supply contracts.

Obligations and deadlines schedule updated: deadlines and notification duties

06

Commissioning, certification and operation

  • Commissioning of the electrolyser
  • Certification audit under a recognised certification scheme
  • First delivery of hydrogen
  • Ongoing operation
ENGEL | LEGAL
  • Legal preparation of the certification audit: review of whether power sourcing and contracts meet the RFNBO requirements
  • Notification and reporting duties: core energy market data register (Marktstammdatenregister), main customs office, network operator
  • Ongoing energy-law advice on relief: network charges, levies, electricity tax, electricity price compensation
  • Legal questions of providing evidence to the funding body and authorities, counting towards the offtakers' quota
  • Disruptions, defects, performance guarantees and claims against contract partners

Obligations and deadlines schedule updated: ongoing reporting and evidence duties

Services

RFNBO check for power sourcing

Review of the planned power sourcing concept against the requirements of Delegated Regulation (EU) 2023/1184 as a short opinion with a meeting, at a fixed fee. The result is a recommendation setting out the requirements for the PPA and grid connection.

Obligations and deadlines schedule

Overview of the obligations and deadlines under statute, permits, funding guidelines and grid connection, updated across the project phases.

Project contracts

Review and negotiation of electricity supply, hydrogen supply and offtake agreements, support with EPC contracts.

AI is used for document review, research and contract analysis. The time saved is passed on in the price. More: Energy and commercial law with AI

Enquiries to mail@engel-legal.de or +49 931 73041732.

Predictable costs: fixed fee for clearly defined assignments, otherwise a cost estimate upfront.